NASA conducted a long-duration RS-25 single-engine test on April 28, continuing its seven-part test series to support development and production of engines for future missions of the agency’s Space Launch System (SLS) rocket. The 650-second test was conducted on the A-1 Test Stand at Stennis. The test provided valuable data to Aerojet Rocketdyne, lead contractor for the SLS engines, as it begins production of new engines for use after the first four SLS flights. Operators are focused on collecting data to demonstrate and verify various engine capabilities, evaluate new engine components manufactured with cutting-edge and cost-saving technologies, eliminate operating risks, and enhance engine production.
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
SSC_2021_0406_RS25EngineTest
Date Created
April 28, 2021
Center
SSC
Media Type
video
Location
Stennis Space Center
Download this video in multiple resolutions. All NASA media are free for public use.
Captions
Subtitles
NASA’s SLS (Space Launch System) Core Stage Prepares for Move to Pegasus Barge
Jul 11, 2024
NASA’s SLS (Space Launch System) Core Stage Prepares for Move to Pegasus Barge
Jul 11, 2024
NASA’s SLS (Space Launch System) Core Stage Prepares for Move to Pegasus Barge
Jul 11, 2024
NASA’s SLS (Space Launch System) Core Stage Prepares for Move to Pegasus Barge
Jul 11, 2024