
Teams at NASA’s Michoud Assembly Facility in New Orleans lift a liquid oxygen tank from a horizontal to a vertical position and place it into a production cell on July 12. The process, called a breakover, will allow technicians to rappel into the empty tank and install its aft sump subassembly, securing it from the inside. This tank will be used on the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission. The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
MAF_20250712_CS3_LOX_BO-to-CellA_009
Date Created
July 12, 2025
Center
MAF
Media Type
image
Photographer
NASA/Eric Bordelon
Location
NASA Michoud Assembly Facility
Download this image in multiple resolutions. All NASA media are free for public use.
Original
Full resolution
Artemis IV Liquid Hydrogen Tank Barrel Moves into Vertical Assembly Center
Oct 3, 2025
Artemis V Moon Rocket in Early Phase of Production
Feb 10, 2025
Core Stage Four Liquid Hydrogen Tank Aft Dome Lifts into Vertical Assembly Center
Oct 27, 2025
Artemis IV Liquid Hydrogen Tank Barrel Moves into Vertical Assembly Center
Oct 3, 2025