
This image shows teams at NASA’s Michoud Assembly Facility lifting a completed dome off of a robotic weld tool on Nov. 21. The dome, which will cap off the aft end of the liquid hydrogen tank, will be used on the core stage of the SLS (Space Launch System) rocket for the agency’s Artemis IV mission. Later, technicians from Boeing – NASA’s prime contractor for SLS – will join the aft dome with five barrels and a forward dome to complete the liquid hydrogen tank. Artemis IV is the first flight of SLS in its Block 1B configuration. The SLS core stage liquid hydrogen tank holds 537,000 gallons of super-cooled propellant and is one of five unique elements that make up the SLS core stage. Together with the forward skirt, liquid oxygen tank, intertank, and engine section, the liquid hydrogen tank will provide propellant to the four RS-25 engines to produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon. Image credit: NASA/Michael DeMocker
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
MAF_20241121_CS4_LH2AftDomeMove03
Date Created
November 21, 2024
Center
MSFC
Media Type
image
Photographer
NASA/Michael DeMocker
Location
NEW ORLEANS, LA, USA
Download this image in multiple resolutions. All NASA media are free for public use.
Original
Full resolution
SLS Liquid Hydrogen Tank in Production for NASA’s Artemis IV Mission
Jun 1, 2023
SLS Liquid Hydrogen Tank in Production for NASA’s Artemis IV Mission
Jun 1, 2023
SLS Liquid Hydrogen Tank in Production for NASA’s Artemis IV Mission
Jun 1, 2023
SLS Liquid Hydrogen Tank in Production for NASA’s Artemis IV Mission
Jun 1, 2023