
These photos show teams at NASA’s Michoud Assembly Facility in New Orleans preparing, moving, and loading the engine section boat-tail of NASA’s SLS (Space Launch System) rocket for the Artemis III mission for transportation to NASA’s Kennedy Space Center in Florida via the agency’s Pegasus barge. Inside the factory on Aug. 14 prior to the move, technicians covered the spaceflight hardware with a tarp to help protect it on its journey aboard NASA’s Pegasus barge. Crews then rolled out the hardware on Aug. 27 from the factory floor to the barge. Once in Florida, the boat-tail will be integrated with the engine section -- also manufactured at Michoud -- inside Kennedy’s Space Station Processing Facility. The engine section arrived at NASA Kennedy in Dec. 2022. Located at the bottom of the engine section, the aerodynamic boat-tail fairing channels airflow and protects the stage’s four RS-25 engines from extreme temperatures during launch. The engine section is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis. Image credit: NASA/Michael DeMocker
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
MAF_20240813_CS3_BoattailLift01
Date Created
August 13, 2024
Center
MSFC
Media Type
image
Photographer
NASA/Michael DeMocker
Location
NEW ORLEANS, LA, USA
Download this image in multiple resolutions. All NASA media are free for public use.
Original
Full resolution
First Components of Artemis V SLS Rocket Manufactured at Michoud
Mar 12, 2024
First Components of Artemis V SLS Rocket Manufactured at Michoud
Apr 2, 2024
First Components of Artemis V SLS Rocket Manufactured at Michoud
Mar 12, 2024
First Components of Artemis V SLS Rocket Manufactured at Michoud
Mar 12, 2024