KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, an overhead crane carrying the P3 Integrated Truss Structure moves into place over a workstand where it will deposit the truss. The port-side P3 truss is scheduled to be added to the International Space Station on mission STS-115 in 2002 aboard Space Shuttle Atlantis. The P3 will be attached to the first port truss segment, P1, being installed in an earlier mission
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC01pp0690
Date Created
March 19, 2001
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Medium
960px