Artemis II Stacking - 2nd Booster Segment Lift to ML (Timelapse)
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-20241122-MH-FMX01-0001-Artemis_II_Stacking_2nd_Booster_Lift_in_VAB-M10348
Date Created
November 22, 2024
Center
KSC
Media Type
video
Photographer
NASA/Frank Michaux
Location
Vehicle Assembly Building (VAB)
Download this video in multiple resolutions. All NASA media are free for public use.
STS-29 Discovery, OV-103, solid rocket booster (SRB) preparation at KSC
Nov 15, 1988
STS-29 external tank (ET) and solid rocket booster (SRB) mating at KSC
Dec 15, 1988
KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, a KSC employee separates the forward assembly (nose cap and frustum) from a solid rocket booster (SRB) after removing the bolts. The destacking is part of time and cycle activities. The SRB was part of the stack on Atlantis originally scheduled for a March 1, 2003, launch on mission STS-114. The SRBs and external tank were demated in February 2003. The mission is now scheduled to occur no earlier than Sept. 12, 2004, on Atlantis.
Dec 9, 2003
KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, a KSC employee separates the forward assembly (nose cap and frustum) from a solid rocket booster (SRB) after the bolts were removed. The destacking is part of time and cycle activities. The SRB was part of the stack on Atlantis originally scheduled for a March 1, 2003, launch on mission STS-114. The SRBs and external tank were demated in February 2003. The mission is now scheduled to occur no earlier than Sept. 12, 2004, on Atlantis.
Dec 9, 2003