
Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, operations are underway to attach a cover, called a spider, to the top of the Space Launch System (SLS) Core Stage pathfinder on Oct. 4, 2019. With the spider secured in place, a crane will be attached to it to lift the pathfinder into the vertical position. The 212-foot-long core stage pathfinder arrived on NASA's Pegasus Barge at Kennedy’s Launch Complex 39 turn basin wharf on Sept. 27, 2019. The Pegasus Barge made its first delivery to Kennedy in support of the agency's Artemis missions. The upgraded 310-foot-long barge arrived, ferrying the SLS core stage pathfinder, a full-scale mock-up of the rocket's core stage. It will be used by Exploration Ground Systems and its contractor, Jacobs, to practice offloading, moving and stacking maneuvers, using important ground support equipment to train employees and certify all the equipment works properly. The pathfinder will stay at Kennedy for approximately one month before trekking back to NASA's Michoud Assembly Facility in Louisiana.
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-20191004-PH-KLS01_0044
Date Created
October 4, 2019
Center
KSC
Media Type
image
Photographer
NASA/Kim Shiflett
Location
VAB
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px
Space Launch System (SLS) rocket and Orion Spacecraft rollout at Kennedy Space Center
Mar 17, 2022
Space Launch System (SLS) rocket and Orion Spacecraft rollout at Kennedy Space Center
Mar 17, 2022
Space Launch System (SLS) rocket and Orion Spacecraft rollout at Kennedy Space Center
Mar 31, 2022
Space Launch System (SLS) rocket and Orion Spacecraft rollout at Kennedy Space Center
Mar 31, 2022