NASA's mobile launcher is secured inside High Bay 3 at the Vehicle Assembly Building (VAB) on Sept. 11, 2018, at NASA's Kennedy Space Center in Florida. In view are several levels of the new work platforms. The crew access arm, at the top, is being extended. The mobile launcher will spend seven months in the VAB undergoing testing. The 380-foot-tall structure is equipped with the crew access arm and several umbilicals that will provide power, environmental control, pneumatics, communication and electrical connections to the agency's Space Launch System and Orion spacecraft. Exploration Ground Systems is preparing the ground systems necessary to launch SLS and Orion on Exploration Mission-1, missions to the Moon and on to Mars.
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-20180911-PH_FWM03_0098
Date Created
September 11, 2018
Center
KSC
Media Type
image
Photographer
NASA/Frank Michaux
Location
VAB HB-3
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px