
CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers remove the 7-inch quick disconnect on the Ground Umbilical Carrier Plate, or GUCP, on space shuttle Endeavour's external fuel tank. A hydrogen leak at the location during tanking for the STS-127 mission caused the launch attempts to be scrubbed on June 13 and June 17. The GUCP will be examined to determine the cause of the hydrogen leak and repaired. The GUCP is the overboard vent to the pad and the flame stack where the vented hydrogen is burned off. Endeavour's next launch attempt is targeted for July 11 at 7:39 p.m. EDT. Photo credit: NASA/Jack Pfaller
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-2009-3824
Date Created
June 24, 2009
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px