
CAPE CANAVERAL, Fla. – A crane lifts space shuttle Atlantis into the upper levels of the Vehicle Assembly Building at NASA's Kennedy Space Center. The shuttle will be moved into high bay 3 and lowered for stacking with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for 1:34 a.m. EDT Oct. 8. Photo credit: NASA/Dimitri Gerondidakis
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-08pd2493
Date Created
August 23, 2008
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px