
KENNEDY SPACE CENTER, FLA. -- Doug Lyons, STS-122 launch director, participates in a news briefing following the conclusion of a Mission Management Team, or MMT, meeting. The meeting followed the morning's launch scrub of the space shuttle Atlantis STS-122 mission caused by problems experienced with the external tank's engine cutoff sensor system during tanking for the second launch attempt. An announcement was made during the briefing that the STS-122 launch is postponed to no earlier than Jan. 2, 2008, to give the team time to resolve the system's problems. Atlantis will carry the Columbus Laboratory, the European Space Agency's largest contribution to the construction of the International Space Station. It will support scientific and technological research in a microgravity environment. Permanently attached to the Harmony node of the space station, the laboratory will carry out experiments in materials science, fluid physics and biosciences, as well as perform a number of technological applications. Photo credit: NASA/Kim Shiflett
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-07pd3599
Date Created
December 9, 2007
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px
STS-35 Columbia, OV-102, passes STS-38 Atlantis, OV-104, heading to Pad 39A
Aug 22, 1990
STS-27 Atlantis, OV-104, ET/SRB mating operations at KSC VAB
Nov 16, 1988
STS-36 Atlantis, OV-104, leaves VAB during its rollout to KSC LC Pad 39A
Jan 25, 1990
STS-37 Atlantis, Orbiter Vehicle (OV) 104, lifts off from KSC LC Pad
Apr 5, 1991