
KENNEDY SPACE CENTER, FLA. -- The orbiter Discovery is lowered toward the mobile launcher platform in high bay 3 of the Vehicle Assembly Building. Behind the vehicle are the external tank and solid rocket boosters already stacked on the MLP. Discovery will be mated to the stack in preparation for launch. Space Shuttle Discovery is scheduled to roll out to Launch Pad 39B no earlier than Nov. 7 for mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Kim Shiflett
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-06pd2437
Date Created
November 1, 2006
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px