
KENNEDY SPACE CENTER, FLA. -- The orbiter Discovery has come to a stop in the transfer aisle of the Vehicle Assembly Building after leaving bay 3 of the Orbiter Processing Facility. First motion was at 9:23 p.m. Oct. 31. Above Discovery and to the right is the overhead crane and sling that will be attached to the orbiter to raise it off the transporter and lift it into high bay 3. There, the orbiter will be mated to its large external tank and twin solid rocket boosters already stacked on the mobile launcher platform. Space Shuttle Discovery is scheduled to roll out to Launch Pad 39B no earlier than Nov. 7 for mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Kim Shiflett
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-06pd2420
Date Created
October 31, 2006
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px