
KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 arrives at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for launch on Aug. 27 to the International Space Station. They have paused to talk to the media before heading to crew quarters in the Operations and Checkout Building. From left are Mission Specialists Steven MacLean, Joseph Tanner and Heidemarie Stefanyshyn-Piper, Commander Brent Jett, Pilot Christopher Ferguson and Mission Specialist Daniel Burbank. MacLean represents the Canadian Space Agency. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-06pd1897
Date Created
August 24, 2006
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px