
KENNEDY SPACE CENTER, FLA. - Space Shuttle Atlantis sits on the hardstand of Launch Pad 39B after its nearly 8-hour rollout from the Vehicle Assembly Building. Extending from the fixed service structure on the left is the orbiter access arm, with the White Room on the outer end, adjacent to Atlantis. Below the orbiter, on each side of the main engine nozzles, are the tail service masts that provide several umbilical connections to the orbiter, including a liquid-oxygen line through one and a liquid-hydrogen line through another. Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Troy Cryder & George Shelton
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-06pd1726
Date Created
August 2, 2006
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px
STS-35 Columbia, OV-102, passes STS-38 Atlantis, OV-104, heading to Pad 39A
Aug 22, 1990
STS-27 Atlantis, OV-104, ET/SRB mating operations at KSC VAB
Nov 16, 1988
STS-36 Atlantis, OV-104, leaves VAB during its rollout to KSC LC Pad 39A
Jan 25, 1990
STS-37 Atlantis, Orbiter Vehicle (OV) 104, lifts off from KSC LC Pad
Apr 5, 1991