
KENNEDY SPACE CENTER, FLA. - After a several-hour trip from the Canister Rotation Facility, the payload canister arrives on Launch Pad 39B. Inside the canister is the payload for Atlantis and mission STS-115, the Port 3/4 truss segment with two large solar arrays. The canister will be positioned alongside the rotating service structure and beneath the payload changeout room (PCR) for transfer of the truss into the PCR. The payload changeout room provides an environmentally clean or "white room" condition in which to receive a payload transferred from a protective payload canister. After the shuttle arrives at the pad, the rotating service structure will close around it and the payload will then be transferred into Atlantis' payload bay. Atlantis' launch window begins Aug. 28. During its 11-day mission to the International Space Station, the STS-115 crew of six astronauts will install the truss, a 17-ton segment of the space station's truss backbone. Photo credit: NASA/George Shelton
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-06pd1672
Date Created
July 26, 2006
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px
STS-35 Columbia, OV-102, passes STS-38 Atlantis, OV-104, heading to Pad 39A
Aug 22, 1990
STS-27 Atlantis, OV-104, ET/SRB mating operations at KSC VAB
Nov 16, 1988
STS-36 Atlantis, OV-104, leaves VAB during its rollout to KSC LC Pad 39A
Jan 25, 1990
STS-37 Atlantis, Orbiter Vehicle (OV) 104, lifts off from KSC LC Pad
Apr 5, 1991