
KENNEDY SPACE CENTER, FLA. - In this closeup, workers can be seen attaching one segment of a large crane around Atlantis to raise it off the transporter into a vertical position. Once it is raised, Atlantis will be lifted into high bay 3 of the Vehicle Assembly Building. Then the orbiter will be lowered and mated with the external tank and solid rocket boosters already stacked on the mobile launcher platform. Atlantis' launch window begins Aug. 28. During its 11-day mission to the International Space Station, the STS-115 crew of six astronauts will install the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/George Shelton
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-06pd1652
Date Created
July 24, 2006
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px