
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, Atlantis is ready to be rolled out on its transporter and moved to the Vehicle Assembly Building. In the VAB, the orbiter will be lifted into high bay 3 for mating to the external fuel tank and solid rocket boosters. Atlantis' launch window begins Aug. 28. During its 11-day mission to the International Space Station, the STS-115 crew of six astronauts will install the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Charisse Nahser
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-06pd1637
Date Created
July 24, 2006
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px