
KENNEDY SPACE CENTER, FLA. -- At the Shuttle Landing Facility, the S5 truss segment for the International Space Station is prepared for ground transport after being offloaded from the Super Guppy transport aircraft on which it arrived. The S5 truss will be taken to the Space Station Processing Facility where it will be fit checked for a Photo-Voltaic Radiator Grapple Fixture. It will also undergo a fit check to a truss simulator to ensure that it will fit properly with the S4 and S6 truss segments. S5 is scheduled for launch in October 2003 on mission STS-118. It will be the tenth truss assembled in an 11-truss structure.
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-02pd0288
Date Created
March 13, 2002
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px