KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, an overhead crane moves the high pressure gas assembly two gaseous oxygen and two gaseous nitrogen storage tanks to the payload canister for transfer to orbiter Atlantis’s payload bay. The tanks are part of the payload on mission STS-104. They will be attached to the Joint Airlock Module, also part of the payload, during two spacewalks. The storage tanks will support future spacewalk operations from the Station and augment the Service Module gas resupply system. STS-104 is scheduled for launch June 14 from Launch Pad 39B
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-01pp1007
Date Created
May 18, 2001
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Medium
960px