
KENNEDY SPACE CENTER, Fla. -- The sun creeps over the horizon (right) as Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, arrives at Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast. At right is the 290-foot high water tank that holds 300,000 gallons of water. It is part of the sound suppression system at the pad. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106.
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
KSC-00pp1121
Date Created
August 14, 2000
Center
KSC
Media Type
image
Location
Kennedy Space Center, FL
Download this image in multiple resolutions. All NASA media are free for public use.
Medium
960px