
KENNEDY SPACE CENTER, FLA. - Members of the Final Inspection Team support an External Tank (ET) tanking test from the Launch Control Center. Launch Pad 39B, where the test is being conducted, can be seen through the window. From left are Doug Powell, Lockheed Martin; Scott Otto, Lockheed Martin; John Blue, NASA; Robert Speece, NASA; and Jorge Rivera, NASA. The tanking test is designed to evaluate how the tank, orbiter, solid rocket boosters and ground systems perform under 'cryo-load,' when the tank is filled with the two ultra-low-temperature propellants. The tank filling and draining portion of the test takes about 11 hours. The test also includes a simulated countdown through the hold at T-31 seconds. The test is being conducted to troubleshoot two issues identified by a tanking test held on April 14. Data is being collected to analyze the liquid hydrogen sensors that gave intermittent readings and the liquid hydrogen pressurization relief valve that cycled more times than standard. The tanking tests are part of preparations for Space Shuttle Discovery's Return to Flight mission, STS-114, to the International Space Station. The launch window extends from July 13 through July 31.
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
05pd1066
Date Created
May 20, 2005
Center
KSC
Media Type
image
Photographer
NASA or National Aeronautics and Space Administration
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px