
KENNEDY SPACE CENTER, FLA. - The orbiter Discovery rolls into the Vehicle Assembly Building (VAB), marking a major milestone in the march to Return to Flight. First motion was at 1:29 a.m. EST. Inside the VAB, Discovery will be mated to the External Tank_Solid Rocket Booster assembly for Return to Flight mission STS-114. After all umbilicals have been connected, workers will perform an electrical and mechanical verification of the mated interfaces to verify all critical vehicle connections. A Space Shuttle interface test is performed to verify vehicle interfaces and vehicle-to-ground interfaces. The launch processing system is used to control and monitor orbiter systems as required. Space Shuttle Discovery will roll out to Launch Pad 39B approximately one week after the rollover to the VAB. The launch window for mission STS-114 is May 15 to June 3.
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
05pd0493
Date Created
March 29, 2005
Center
KSC
Media Type
image
Photographer
NASA or National Aeronautics and Space Administration
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px