
KENNEDY SPACE CENTER, FLA. - Shuttle Launch Director Mike Leinbach talks to STS-114 Mission Commander Eileen Collins as they watch the newly redesigned External Tank being lifted in the Vehicle Assembly Building to a “checkout cell” where the tank’s mechanical, electrical and thermal protection systems are inspected. Collins and the rest of the crew are at Kennedy to observe tank activities. The tank will also undergo new processes resulting from its redesign, including inspection of the bipod heater and External Tank separation camera. The tank is designated to fly on Shuttle Discovery on Return to Flight mission STS-114. The launch window is May 12 to June 3, 2005.
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
05pd0095
Date Created
January 7, 2005
Center
KSC
Media Type
image
Photographer
NASA or National Aeronautics and Space Administration
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px