
KENNEDY SPACE CENTER, FLA. - The redesigned External Tank is being raised to a vertical position in the Vehicle Assembly Building and will be lifted into the 'checkout cell' where the tank’s mechanical, electrical and thermal protection systems are inspected. The tank will also undergo new processes resulting from its redesign, including inspection of the bipod heater and External Tank separation camera. The tank will be prepared for 'mating' to the Shuttle’s Solid Rocket Boosters. When preparations are complete, the tank will be lifted from the checkout cell, moved across the transfer aisle and into High Bay 1. It will be lowered and attached to the boosters, which are sitting on the Mobile Launch Platform. The SRBs and ET will be flying with Shuttle Discovery for the Return to Flight mission STS-114. The launch planning window is May 12 to June 3, 2005.
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
05pd0087
Date Created
January 7, 2005
Center
KSC
Media Type
image
Photographer
NASA or National Aeronautics and Space Administration
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px