
KENNEDY SPACE CENTER, FLA. - United Space Alliance technicians Todd Dugan and Jake Senior (at left) work on the Orbiter Boom Sensor System in the Remote Manipulator System lab while USA engineer Ron Kennedy (right) looks on. The OBSS is undergoing final checkout and testing in the lab prior to being transferred to the Orbiter Processing Facility for installation on Space Shuttle Discovery. The 50-foot-long OBSS will be attached to the Remote Manipulator System, or Shuttle arm, and is one of the new safety measures for Return to Flight, equipping the orbiter with cameras and laser systems to inspect the Shuttle's Thermal Protection System while in space. Discovery is slated to fly mission STS-114 once Space Shuttle launches resume. The launch planning window is May 12 to June 3, 2005.
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
05pd0067
Date Created
January 6, 2005
Center
KSC
Media Type
image
Photographer
NASA or National Aeronautics and Space Administration
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px