
KENNEDY SPACE CENTER, FLA. - After training on the M-113 armored personnel carrier, the STS-109 crew gather for a photo. Seated on top are (left to right) Payload Commander John Grunsfeld, Commander Scott Altman and Mission Specialists Nancie Currie and James Newman; standing below are Pilot Duane Carey and Mission Specialists Richard Linnehan and Michael Massimino. The carrier is part of emergency egress training at the launch pad. The crew is taking part in Terminal Countdown Demonstration Test activities that also include a simulated countdown at the pad. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require grasping the satellite with a robotic arm in order for the crew to perform the tasks during five spacewalks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
02pd0071
Date Created
January 30, 2002
Center
KSC
Media Type
image
Photographer
NASA or National Aeronautics and Space Administration
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px