
KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis, on its Mobile Launcher Platform, is once again ready to roll out to Launch Pad 39A, this time on another crawler transporter. An attempt to roll out on Jan. 2 incurred a failed computer processor on the first crawler transporter. Using a secondary computer processor on the vehicle, the Shuttle was returned to the Vehicle Assembly Building. Atlantis will fly on mission STS-98, the seventh construction flight to the International Space Station, carrying the U.S. Laboratory, named Destiny. The lab module will have five system racks already installed inside. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. Atlantis is scheduled for launch no earlier than Jan. 19, 2001, with a crew of five
Most NASA images are in the public domain and free to use. Credit NASA as the source. Check NASA's media usage guidelines for details. Images featuring identifiable individuals may require additional permissions.
NASA ID
01padig001
Date Created
January 3, 2001
Center
KSC
Media Type
image
Photographer
NASA
Download this image in multiple resolutions. All NASA media are free for public use.
Large
1920px